Fiber Existing Conditions and Base Mapping

Useful fiber drawings start with a traceable base map. True North organizes authorized records and qualified field information so the project team can distinguish known conditions from assumptions.

For network owners, operators, contractors and property teams nationwide. Technical design, field work and operating decisions remain assigned to the qualified, authorized parties.

Request a project review

What the scope can include

Select the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.

  • Collect and date the source information

    Reconcile imagery, road and utility records, permits, parcel references, existing cable/conduit routes and owner asset data. Track source dates, permissions and coordinate systems.

  • Coordinate field and utility information

    Define survey, pole inventory, photographs, structure inspections, utility locating and exposure needs. Qualified providers establish the accuracy and limits of their findings.

  • Build a controlled project background

    Align route segments, structures, crossings and building endpoints across CAD and GIS. Flag inconsistent positions, unknown depths and discrepancies rather than silently filling gaps.

  • Preserve verification status

    Deliver the agreed layers, identifiers and data notes. Certified survey products, legal boundaries and subsurface determinations remain with the responsible qualified providers.

Prepare for the assignment

You can start with incomplete records. Tell us what is available and what still needs to be established.

  • Information to bring

    Dated surveys, utility records, field findings, coordinate systems and access permission. Provide the current versions and identify information that remains unverified.

  • The agreed handoff

    A coordinated base-map package and source/accuracy register with explicit investigation gaps.

Decisions, fees and timing

Scope and dependencies determine the proposal. No universal price or approval date is assumed.

  1. Confirm the basis and responsibility

    Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.

  2. Coordinate and review the work

    Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.

  3. Account for project-specific dependencies

    Field access, data accuracy, corridor length and differing coordinate systems. The proposal separates professional work, outside charges and review dependencies.

  4. Deliver the defined milestone

    Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.

Fielding, utility investigation and 811

Use the route design decisions to define the evidence needed. A mapped line, a surface observation and an exposed utility provide different information.

  • Fiber fielding and base mapping

    Fiber fielding collects route observations such as pole inventory, structures, access conditions and photographs. Base mapping reconciles those observations with surveys, owner records and coordinates. Record the collection date, method, source and uncertainty for each dataset; drawings can then identify what is observed, supplied by others or still unverified.

  • SUE, GPR and exposure locations

    Subsurface utility engineering (SUE) is a coordinated investigation process, not a single instrument. Ground penetrating radar (GPR) is one possible geophysical method; suitability depends on site conditions and the target. Potholing exposes selected utilities for documented measurements using appropriate methods and permissions. Qualified providers set the investigation scope, interpret findings and state their limitations. Use the resulting records to resolve identified route conflicts.

  • 811 coordination and private utilities

    The applicable 811 one-call process notifies participating utility operators about planned excavation. Track the ticket, work limits and responses with the excavator. It does not replace the design investigation, establish every utility depth or ensure private lines are covered. Identify privately owned facilities and any separate locating arrangement before treating the utility information as complete.

Before you begin

Common questions

Does a parcel map establish a legal boundary?

No. Parcel references are useful screening information; boundary and legal-right questions need the applicable survey and legal records and qualified review.

Which utility depths still need qualified investigation?

Identify every depth or conflict on which the design depends, then obtain the responsible specialist’s investigation scope. Do not infer a verified depth from an unconfirmed utility line.

Your next step

A project in mind?
Let’s give it direction.

Start with what you know. We’ll help define the path ahead.