Fiber & telecom · Nationwide
Useful fiber drawings start with a traceable base map. True North organizes authorized records and qualified field information so the project team can distinguish known conditions from assumptions.
For network owners, operators, contractors and property teams nationwide. Technical design, field work and operating decisions remain assigned to the qualified, authorized parties.
Request a project reviewSelect the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.
Reconcile imagery, road and utility records, permits, parcel references, existing cable/conduit routes and owner asset data. Track source dates, permissions and coordinate systems.
Define survey, pole inventory, photographs, structure inspections, utility locating and exposure needs. Qualified providers establish the accuracy and limits of their findings.
Align route segments, structures, crossings and building endpoints across CAD and GIS. Flag inconsistent positions, unknown depths and discrepancies rather than silently filling gaps.
Deliver the agreed layers, identifiers and data notes. Certified survey products, legal boundaries and subsurface determinations remain with the responsible qualified providers.
You can start with incomplete records. Tell us what is available and what still needs to be established.
Dated surveys, utility records, field findings, coordinate systems and access permission. Provide the current versions and identify information that remains unverified.
A coordinated base-map package and source/accuracy register with explicit investigation gaps.
Scope and dependencies determine the proposal. No universal price or approval date is assumed.
Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.
Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.
Field access, data accuracy, corridor length and differing coordinate systems. The proposal separates professional work, outside charges and review dependencies.
Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.
Before you begin
No. Parcel references are useful screening information; boundary and legal-right questions need the applicable survey and legal records and qualified review.
Identify every depth or conflict on which the design depends, then obtain the responsible specialist’s investigation scope. Do not infer a verified depth from an unconfirmed utility line.
Your next step
Start with what you know. We’ll help define the path ahead.