Houston-based · Serving projects nationwideCall or text (346) 266-3482English & Español
True North Permitting and Design Consultants LLC

Design & documentation · Nationwide

Drawing and Coordination Support for Specialty Trades

Trade work often touches systems beyond the installation itself. True North coordinates the drawings and design interfaces needed for a clear specialty package.

For owners, project teams and delivery partners nationwide. The written scope identifies True North’s work, the responsible professionals and any separately contracted construction.

Request a project review

What the scope can include

Select the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.

  • Building-system trades

    Connect electrical, plumbing, HVAC and fire-protection inputs with current backgrounds, equipment schedules and responsible design. Record the boundary between delegated specialty work and base-building design.

  • Specialty construction packages

    Coordinate pool, sign, roofing, metal-building, telecom and landscape packages with structural, civil and utility interfaces. Use actual product and installation information.

  • Changes and permit interfaces

    Organize supporting documents, questions, owner approvals and revisions. The trade contractor retains its installation and field obligations; qualified professionals retain technical design responsibility.

Prepare for the assignment

You can start with incomplete records. Tell us what is available and what still needs to be established.

  • Information to bring

    Current plans, product data, installation limits, connection requirements, trade design responsibilities and permit or inspection comments.

  • The agreed handoff

    An integrated specialty document package and responsibility register for design, submission and construction interfaces.

Decisions, fees and timing

Scope and dependencies determine the proposal. No universal price or approval date is assumed.

  1. Confirm the basis and responsibility

    Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.

  2. Coordinate and review the work

    Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.

  3. Account for project-specific dependencies

    Assignment size, source-data quality, file standards, review cycles and changes to the authorized technical direction.

  4. Deliver the defined milestone

    Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.

Before you begin

Common questions

Can one trade submission cover other disciplines?

Only if the required work and responsible parties are explicitly included. Identify connected structural, civil and building-system needs rather than assuming they are covered.

How is overflow or repeat work scoped?

Agree the specific deliverables, source information, review authority, file formats and handoff milestone. New technical design, field investigation or additional submissions are identified as changes when outside that agreement.

Your next step

A project in mind?
Let’s give it direction.

Start with what you know. We’ll help define the path ahead.

Request a project review