The shortest line on a map may not be the route a project can use. True North compares fiber corridors using access, infrastructure, crossings, construction constraints and unresolved technical questions.
For network owners, operators, contractors and property teams nationwide. Technical design, field work and operating decisions remain assigned to the qualified, authorized parties.
Request a project reviewSelect the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.
Screen routes, service extensions, conversions and diversity options against owner endpoints and capacity objectives. Record length, crossings, authorities, restoration and disruption using a consistent set of assumptions.
Investigate the records for existing conduit, poles, rights and entry locations. Capacity, condition, loading, occupancy and permission need confirmation before a reusable route is treated as available.
Identify utility conflicts, limited bore setup, ground information, occupied access and building-entry problems. Route unresolved feasibility decisions to property, technical and construction specialists.
Produce an alternatives and risk register with required field work and owner decisions. Distinguish actual physical separation from routes that share a pole line, crossing, duct bank or entrance.
You can start with incomplete records. Tell us what is available and what still needs to be established.
Candidate corridors, pole/conduit records, access constraints and target capacity. Provide the current versions and identify information that remains unverified.
A route comparison with assumptions, constraints, investigation priorities and an owner decision record.
Scope and dependencies determine the proposal. No universal price or approval date is assumed.
Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.
Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.
Crossing count, usable infrastructure, restoration and unverified rights. The proposal separates professional work, outside charges and review dependencies.
Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.
Before you begin
Only after the relevant condition, capacity, technical and permission questions are resolved. Existing mapping is a starting point, not evidence of available space or attachment rights.
Shared poles, ducts, crossings, bridges or building entrances can leave separate services exposed to the same event. Document the physical paths and obtain the owner’s resilience criteria.
Your next step
Start with what you know. We’ll help define the path ahead.