Design & documentation · Nationwide

Electrical Power, Lighting and Energy Coordination

New equipment, a different use or backup power can change the building’s electrical needs. True North coordinates load information, utility interfaces and design documents with the responsible electrical professionals.

For owners, project teams and delivery partners nationwide. The written scope identifies True North’s work, the responsible professionals and any separately contracted construction.

Request a project review

What the scope can include

Select the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.

  • Service and distribution

    Collect loads, existing service data, panel and feeder information and utility requirements. Coordinate distribution, metering and equipment access with the site and building layout.

  • Lighting and equipment power

    Coordinate interior, exterior and emergency-lighting requirements, controls and equipment connections. Align manufacturer inputs and circuiting with mechanical, plumbing, fire and communications systems.

  • Backup power and energy projects

    Organize generator, transfer, storage, solar and vehicle-charging interfaces where included. Technical design, utility interconnection, fire review and installation responsibilities remain explicitly assigned.

Prepare for the assignment

You can start with incomplete records. Tell us what is available and what still needs to be established.

  • Information to bring

    Existing electrical records, utility service information, equipment loads and data, proposed layouts, operating requirements and any continuity or backup-power objectives.

  • The agreed handoff

    An electrical input and interface register, coordinated design/drawing package and tracked utility or specialty approvals for the agreed installation.

Decisions, fees and timing

Scope and dependencies determine the proposal. No universal price or approval date is assumed.

  1. Confirm the basis and responsibility

    Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.

  2. Coordinate and review the work

    Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.

  3. Account for project-specific dependencies

    Existing capacity, service upgrades, equipment and interconnection lead times, new loads, continuity requirements and technical revisions.

  4. Deliver the defined milestone

    Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.

Electrical service, loads and distribution drawings

New equipment, added floor area or tenant separation can change both the building distribution and the utility service. Start with verified existing records, proposed loads and the provider’s information; a panel rating or empty breaker space alone does not demonstrate available capacity.

  • Load assessment, metering and service upgrades

    The electrical load assessment compares existing and proposed demand using documented equipment, operating conditions and the responsible designer’s assumptions. Gather service records, bills or measured information where relevant, equipment schedules and utility correspondence. Service upgrades and tenant service separation require metering, distribution boundaries, landlord decisions, outage/phasing and utility work to be coordinated. The electrical professional and provider determine their respective design and acceptance requirements.

  • One-lines, risers, panel schedules and load letters

    An electrical one-line or single-line diagram summarizes distribution connections, equipment ratings and protection. A riser diagram can show vertical distribution relationships. A panel schedule organizes circuit identifiers, connected loads and equipment references. A load letter communicates the requested service/load basis to the utility in its accepted format. Each output serves a different purpose. Coordinate them with calculations, floor plans and current equipment data. Keep utility acceptance, permit approval and contractor installation details distinct.

  • Feeders, circuits, disconnects, grounding and bonding

    The agreed drawing package can locate feeders, branch circuits, receptacles and equipment connections, with required schedules, calculations and details by the responsible electrical designer. Coordinate actual voltage/phase, routes, protection, disconnects and manufacturer requirements. Grounding and bonding address distinct system and conductive-component connections; their design must align with service, equipment, structures and applicable pool or specialty interfaces. Qualified contractors perform installation under the agreed construction scope.

Lighting, emergency operation and equipment controls

Lighting drawings and a complete power-distribution package are different deliverables. Establish room tasks, site use, ceilings, egress and equipment first, then define which calculations, schedules and controls are included.

  • Lighting plans, fixture schedules and photometrics

    Interior and exterior lighting plans locate fixtures and connect their use to mounting, power and controls. A fixture schedule identifies selected luminaires and their data; lighting photometrics use fixture performance and geometry to evaluate the specified illumination criteria. Supply layouts, mounting heights, product data and owner/site restrictions. Coordinate switching, dimming, occupancy/daylight controls and energy documentation with ceilings, access and neighboring properties where relevant.

  • Emergency lighting and exit-sign power

    Coordinate the architectural egress layout with emergency-lighting locations, exit-sign power, source and circuit/control arrangements. The responsible electrical and life-safety teams establish operation and required verification for the actual building. Changes to exits, ceilings or backup sources must be reflected in the affected documents; ordinary room lighting does not establish the emergency arrangement.

  • Equipment connections and interlocks

    Use the current manufacturer schedule to coordinate kitchen appliances, industrial machinery, pool systems and powered signs. Record loads, voltage/phase, disconnects and required control interfaces. Interlocks coordinate equipment actions, such as kitchen exhaust and related shutdown functions, with the responsible mechanical and fire designers. Pool bonding/protection and sign controls have their own interfaces; identify specialty drawings and acceptance duties rather than assuming one circuit note covers them.

Electrical studies and investigation scope

Specialist studies use a defined system model and reliable operating data. The proposal must identify the specific analysis, responsible qualified professional, inputs, output and any separate field investigation; these studies are not automatically included in every permit set.

  • Fault current and protective-device coordination

    Available fault-current evaluation compares utility/source information and system characteristics with the equipment and protection basis. Protective-device coordination evaluates how selected devices and settings respond within the defined system. Provide one-lines, conductor and transformer information, equipment ratings, device data and operating configurations. The specialist’s calculations and settings recommendations need review against the actual installation and utility information before implementation.

  • Arc-flash study inputs and outputs

    An arc-flash study uses the documented electrical system, fault information, protective-device behavior and operating scenarios for qualified analysis. Agree the report, assumptions, labeling information and coordination with the owner’s electrical safety program. Missing or changed equipment data can require further investigation or an updated study; a permit drawing or generic label does not establish a safe condition for energized work.

  • Power-quality investigation

    For nuisance trips, voltage disturbances or equipment-performance concerns, collect event history, operating schedules, affected loads and available measurements. The qualified electrical specialist defines monitoring, analysis of disturbances or harmonics and any corrective design scope. Keep observation, measurement and conclusions traceable; document whether the next action belongs to the utility, equipment supplier, building system or further testing.

Backup power, energy systems and vehicle charging

Define the operating objective before choosing equipment: required emergency loads, optional continuity, energy production, storage or charging. Each arrangement needs its own electrical architecture, site information, utility review and applicable structural and fire interfaces.

  • Generators, transfer switches and UPS

    Identify which loads need emergency or standby power and the required operating/continuity basis. Generator coordination includes fuel, exhaust, location, foundations, noise, electrical distribution and transfer-switch arrangements. An uninterruptible power supply (UPS) also needs protected loads, runtime objectives, batteries, cooling, bypass and maintenance access defined. The responsible specialists coordinate diagrams, equipment and testing requirements; purchasing a source alone does not establish an accepted backup system.

  • Solar photovoltaic and battery storage

    Solar photovoltaic (PV) work connects the array layout, mounting, structural loads, electrical design, fire-access interfaces and utility interconnection. A battery energy storage system (BESS) adds technology, capacity, location, protection, thermal management and qualified fire review. Provide current equipment data, site/roof records and operating objectives for the agreed drawings, calculations and submission package. These systems have different hazards and review dependencies even when connected together.

  • Microgrids and interconnection records

    A microgrid combines defined generation, storage or loads under a coordinated control strategy; islanding objectives and utility interaction require qualified integrated design. Establish the one-line, source/load data, protection and control responsibilities with the operator and utility. An interconnection package can organize diagrams, equipment data, applications and responses, but utility permission and commissioning remain separate from preparation of those records.

  • EVSE, DC fast charging and fleet demand

    Electric vehicle supply equipment (EVSE) includes charging equipment with different power and operating needs; DC fast charging (DCFC) is not the same service arrangement as lower-power charging. Provide charger data, vehicle/fleet schedules, parking and accessible-use layouts, existing service and expansion plans. Coordinate demand management, distribution, utility capacity, protection, circulation and phased installation. The agreed handoff can identify load scenarios, equipment layouts, electrical documents and provider decisions without promising capacity or a connection date.

Before you begin

Common questions

Does unused panel space mean there is capacity?

Physical space alone does not establish available electrical capacity. The responsible professional evaluates the actual loads, equipment and service information.

Can backup power be added as an isolated equipment purchase?

It needs a coordinated installation scope, including transfer arrangements, fuel or energy storage, ventilation, structural and fire interfaces as applicable.

Is a utility load letter the same as electrical permit drawings?

No. A load letter addresses the provider’s requested load/service information. Permit drawings can include distribution diagrams, plans, schedules and supporting calculations for the defined work. Keep the provider’s review, the authority’s permit decision and contractor installation documents distinct.

Are electrical studies included in every plan set?

No. Define fault-current evaluation, protective-device coordination, arc-flash analysis or power-quality investigation separately when the project needs them. The responsible specialist establishes data, calculations, field work and deliverables; a drawing package does not replace that analysis.