Construction-Phase Design Support

Questions and changes during construction need a controlled path back to the responsible design team. True North coordinates technical information, revisions and project records while preserving the contractor’s field responsibilities.

For owners, project teams and delivery partners nationwide. The written scope identifies True North’s work, the responsible professionals and any separately contracted construction.

Request a project review

What the scope can include

Select the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.

  • Technical questions and submittals

    Organize requests for information, product submissions, shop-drawing interfaces and substitutions. Route technical decisions to the assigned professional and record the version and response that construction may rely on.

  • Revisions and field observations

    Coordinate design changes, site observation records and conflicts between drawings and field conditions. Distinguish documented observations from continuous inspection or a guarantee of concealed work.

  • Occupied buildings and phased work

    Track temporary arrangements, work areas, access, owner operations and required approvals. Connect phasing decisions with fire/life-safety, utilities and contractor planning rather than treating a schedule as technical authorization.

Prepare for the assignment

You can start with incomplete records. Tell us what is available and what still needs to be established.

  • Information to bring

    Issued drawings, approved permits, construction schedule, questions and submittals, dated field information and the authority to approve changes.

  • The agreed handoff

    A controlled response/change register, coordinated revised documents and agreed observation or phase-handoff records.

Decisions, fees and timing

Scope and dependencies determine the proposal. No universal price or approval date is assumed.

  1. Confirm the basis and responsibility

    Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.

  2. Coordinate and review the work

    Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.

  3. Account for project-specific dependencies

    Question volume, design changes, field access, occupied operations, response dependencies and additional authority review.

  4. Deliver the defined milestone

    Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.

Before you begin

Common questions

Can a contractor’s field change be added to drawings afterward?

Document it promptly and obtain the responsible professional’s review and applicable authorization. Recording a change does not automatically accept its design or permitting status.

Does this service include construction supervision?

Only specifically contracted services are included. Contractor supervision, means and methods, safety and continuous inspection are not implied by document coordination.