A complete drawing package still needs the right application, authorized applicant and a clear record of what happens next. True North coordinates submission preparation, agency communication and follow-up around the actual approvals your project needs.
For owners, tenants, developers, contractors and design teams managing commercial, residential or infrastructure work nationwide. Expediting means managing completeness and dependencies; it does not guarantee an agency's review speed or decision.
Request a project reviewAn approval matrix records each reviewing party, application, authorized applicant, prerequisite, technical document, charge and completion condition. Not every project needs every approval listed here.
Coordinate new building, addition, interior alteration, tenant finish and shell applications around the actual work. Identify change-of-use or occupancy reviews, structural alterations, demolition limits and accessory structures. Retained building systems, deferred tenant work, utility disconnections and release conditions need to remain visible.
Coordinate electrical, mechanical, plumbing and gas information with the responsible applicant and trade contractor. Sprinklers, fire alarms, special suppression and underground fire lines can require distinct planning, system interfaces, applications and acceptance records. Qualified design and the installer's responsibilities are assigned separately.
Coordinate grading, drainage, paving, utilities, access and environmental interfaces. Right-of-way, street-cut and driveway work bring traffic, restoration, roadway-owner and applicant requirements. Floodplain development and on-site sewage facility applications depend on their own qualified studies, evaluations and design inputs.
Pool construction and aquatic health reviews connect the pool, equipment, barriers and support facilities. Signs, fences and retaining walls need appropriate location, geometry, structure, power or drainage information. Temporary structures and event sites also need a defined duration, anchorage, access, utilities, crowd arrangements and removal scope.
Coordinate elevator and boiler teams, building interfaces, applicable registrations, inspections and certificates. Health construction review depends on actual operations, layouts, equipment, finishes and sanitation. Facility documents supporting an operating license are coordinated with the responsible operator or specialist; a building permit is not a substitute for that license.
Coordinate railroad-owner and pipeline-owner crossings using route, clearance, protection, access and restoration information. Support utility encroachment agreements with technical exhibits for the responsible parties. Aviation notice work uses the qualified team's location, elevation and equipment-height information. Environmental permit changes and agency appeals use specialist input, factual records and authorized representation.
The application and its attachments should describe the same scope as the technical documents.
Match the work to the application category and confirm who must sign, certify or submit it. Prepare owner authorization for the owner's execution. Define the roles of the owner, professional, contractor and any authorized representative without assuming one role can file every application.
Prepare a consistent project description, coordinate requested construction-value information and collect supporting studies, calculations, surveys, product records and certifications. Record missing information and who must provide it before submission.
Coordinate page sizes, orientation, naming, bookmarks, current revisions, signatures and seals with the receiving system's requirements. Check completeness and consistency across the package. Preserve the controlling set instead of mixing sheets from different revisions.
Submit through the authorized channel and preserve the confirmation, date, application reference and uploaded version. Track agency invoices, payment responsibility, receipts and payment-related holds as separate actions.
A status log should show what is waiting, who is responsible and which record supports the status.
Record the reviewing parties, current stage, deadlines, outstanding decisions and next action. Follow up through the authority's available procedures and route technical questions to the responsible designers. Missing information, external dependencies and review queues are distinguished.
Identify whether comment-response coordination and collecting the issued permit are included in the engagement. A submitted package, an approved drawing set, permit issuance and permission to occupy are different milestones. Record remaining conditions and separate approvals at handoff.
Application count, package readiness, professional responses, owner decisions and agency queues affect the effort and elapsed time. Agency charges and optional agency review programs, if available for the actual project, are identified separately from True North's services. No fee or expedited-review option guarantees approval.
Start with the project and current status, even if some records are missing.
Provide the project location, intended work, complete available technical set, existing application numbers and known authority requirements. Identify the owner, authorized applicant, responsible professionals and outstanding owner decisions. Share sensitive records only through the handoff agreed for your engagement.
Before you begin
No. It organizes completeness, communication, dependencies and follow-up within the reviewing body's available procedures. The authority controls its review queue, interpretation and decision.
That depends on the application and authority. Some work has a specific owner, professional or contractor role. We confirm the required applicant and authorization before filing rather than assuming one representative can submit everything.
Yes, within an agreed scope and with the necessary authorizations. We need the complete current set and a clear path to the responsible designers for technical questions, revisions or certifications.
The proposal identifies included services and the party responsible for agency charges. Payment responsibility and any reimbursable costs should be explicit before submission; do not assume every charge is included.
Only if issuance is the agreed endpoint. Construction inspections, deferred submissions, testing, occupancy and operational approvals may remain. The handoff identifies those next responsibilities.