Houston-based · Serving projects nationwideCall or text (346) 732-7844Español

Service areas · Local approval pathways

Design and Permitting Support in West Virginia

Use the current fire-review portal while preserving legacy revision records and road permissions. True North supports owners, operators, design teams and contractors with project documentation and permit coordination, from an existing building to a fiber route.

Start with the actual property or route and the decision holding up your project. Nationwide service describes our coverage; the agency, asset owner and qualified project team still determine the requirements for each location.

Request a project review

Establish the reviewing authority

Use the parcel or mapped route, intended operation and scope of work to identify the offices involved.

  • West Virginia Fire Marshal plans review

    West Virginia's Fire Marshal requires new plan submissions through its digital portal. Its current notice gives a different contact path for revisions to older records beginning with PR. Creating a duplicate new project can lose the connection to the existing approval history.

  • Prepare the building and use information

    Identify the existing document number, building use and proposed changes. Confirm state and local responsibilities, use the correct new or revision pathway, and coordinate architectural, structural, MEP and specialty fire information with the responsible team.

  • Verify boundaries before choosing a portal

    Find the parcel on the relevant local government map. Confirm municipal or county jurisdiction with its planning or permitting office. For a route, mark each change of road, property and asset ownership. A postal city, online map pin or nearby project is only a starting clue. Confirm the actual authority before submitting.

Coordinate roadway and utility permissions

A public road approval, utility-owner acceptance and permission to enter private property solve different parts of the route.

  • West Virginia DOT encroachment permits

    WVDOT publishes an encroachment permit path and MM-109 form for work affecting state right-of-way, including property access. A building approval should not be used as evidence that a new approach or roadside occupation has been authorized.

  • Prepare the route and applicant information

    Identify the district or county office, road, property access and facility footprint. Confirm the utility-specific requirements for the proposed alignment and any excavation, traffic or restoration conditions before treating the road approval as complete.

  • Identify each crossing and access owner

    Mark poles, railroads, waterways, building entrances and private easements that affect the proposed work. Have the responsible survey, engineering, environmental and property-rights parties resolve their assigned questions. Preserve the distinction between a drawing approval, an access agreement and authorization to start construction.

Turn the scope into an approval and handoff plan

Not every project needs every review. Record the reason each pathway applies, or the authority's determination that it does not.

  • Screen site and operating requirements

    Ask the relevant local offices about land use, site development, drainage and floodplain conditions. Food service, care, assembly, pools, storage and other operations can introduce health, fire or licensing questions. Share the actual operating description, equipment and occupants so these are evaluated alongside the plans.

  • Assign production and professional decisions

    True North can coordinate the agreed drawings, applications, comment register and project records. The responsible professionals retain technical design, survey and signature duties. Owners authorize decisions and access. Contractors retain their construction responsibilities. Define these roles in the proposal, including field information and any partner construction scope.

  • Track issuance, inspections and final records

    Keep a register with authority, scope, application number, plan revision, next action, responsible party and expiration or release condition. Include required inspections, restoration, specialty acceptance and owner records. Fees and timing depend on the actual scope and external decisions; an uploaded package is not a permit or a guaranteed start date.

Before you begin

Common questions

What should I send for a project in West Virginia?

Identify the existing document number, building use and proposed changes. Confirm state and local responsibilities, use the correct new or revision pathway, and coordinate architectural, structural, MEP and specialty fire information with the responsible team. For a route, include the mapped limits and asset owner. Send a brief summary first; we can identify an appropriate way to exchange detailed project documents after defining the scope.

Does the West Virginia page replace a local permit checklist?

No. It identifies researched starting points and preparation questions. The applicable city, county, state office or asset owner sets the current requirements for your project. Confirm those with the actual location and proposed use before filing.

Can you coordinate a limited assignment or a larger project?

Yes. We can scope a specific drawing, review-comment response or application, or coordinate a broader document and approval package. Identify the desired handoff and existing team so responsibilities and exclusions are clear.

Source check ·

Official sources and application starting points

Use the linked authority’s current instructions for your actual property, use and work. Agency procedures can change; a source check is not a project approval.

Your next step

A project in mind?
Let’s give it direction.

Start with what you know. We’ll help define the path ahead.

Request a project review