Design & documentation · Nationwide
The building, roads, ground levels and drainage need to work as one site. True North coordinates civil inputs and permit documentation around the actual property and the responsible engineers’ design.
For owners, project teams and delivery partners nationwide. The written scope identifies True North’s work, the responsible professionals and any separately contracted construction.
Request a project reviewSelect the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.
Coordinate surveys, boundaries, grading limits, earthwork, building placement and interfaces with adjacent land. Keep field data, proposed elevations and constraints aligned across disciplines.
Bring parking, loading, driveways, circulation, pavement and roadway interfaces into the package. Larger transportation or civil structures require the applicable specialist design and owner review.
Coordinate stormwater collection, conveyance, detention, discharge and water-quality work with the responsible designer. Record off-site connections, maintenance responsibilities and dependencies on receiving-system information.
Track flood-related studies, authority decisions and construction stormwater documentation, including SWPPP/SWP3 scope where applicable. Operational drainage design and construction controls are distinct responsibilities and deliverables.
You can start with incomplete records. Tell us what is available and what still needs to be established.
Current survey and topography, proposed site layout, existing drainage and utilities, available geotechnical information, access constraints and prior civil approvals.
A coordinated site/civil package, supporting study register and approval dependencies, with unresolved off-site or authority requirements clearly identified.
Scope and dependencies determine the proposal. No universal price or approval date is assumed.
Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.
Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.
Site size and grades, downstream information, flood-related studies, off-site improvements, earthwork and revision of the building or access layout.
Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.
Before you begin
Not by itself. Ground levels, runoff, discharge conditions and receiving systems need the applicable civil review and supporting information.
The agreement identifies whether those plans, permits, inspections or records are included and who is responsible. Describe the whole disturbance and construction sequence when requesting a scope.
Your next step
Start with what you know. We’ll help define the path ahead.