Construction Partner and Procurement Coordination

True North offers construction services through construction partners. We connect the approved design, procurement information and scope boundaries so the intended physical work can be priced and delivered under a clear agreement.

For owners, project teams and delivery partners nationwide. The written scope identifies True North’s work, the responsible professionals and any separately contracted construction.

Request a project review

What the scope can include

Select the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.

  • Define the physical work

    Identify site, structural, enclosure, building-system and specialty packages, their interfaces and exclusions. Record which partner or contractor is responsible for installation, permits, protection, safety and field supervision.

  • Pricing and procurement

    Assemble the controlled drawing set, quantities or schedules where included, bid questions, allowances and alternate proposals. Keep estimates tied to design maturity and written assumptions rather than presenting an unreviewed number as a guaranteed price.

  • Coordinate the start and handoff

    Track owner selections, approved substitutions, long-lead information and readiness dependencies. Construction-phase responses and completion records are included only to the extent stated in the agreement.

Prepare for the assignment

You can start with incomplete records. Tell us what is available and what still needs to be established.

  • Information to bring

    Current drawings and approvals, desired construction scope, site access constraints, owner selections, bid requirements and the proposed contracting arrangement.

  • The agreed handoff

    A coordinated construction scope and document package, responsibility matrix and procurement/action register for the agreed milestone.

Decisions, fees and timing

Scope and dependencies determine the proposal. No universal price or approval date is assumed.

  1. Confirm the basis and responsibility

    Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.

  2. Coordinate and review the work

    Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.

  3. Account for project-specific dependencies

    Design maturity, access and phasing, material availability, contractor proposals, changes and unresolved approvals.

  4. Deliver the defined milestone

    Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.

Quantity takeoffs and comparable bids

Use a controlled drawing revision, written scope and stated measurement basis to compare proposed construction. Advisory cost and scope records support decisions; the contractor’s accepted agreement establishes its commitment.

  • Quantity takeoff and scope-gap review

    A quantity takeoff records measured items, units, drawing references and assumptions. Identify allowances for incomplete design, exclusions and whether waste or installation accessories are included. A scope-gap review compares the intended work with each trade proposal and flags missing or overlapping responsibilities. Bring drawings, specifications, schedules and contractor clarifications for an auditable comparison register.

  • Bid comparison and value analysis

    Compare the same work boundaries, alternates, allowances, access conditions and schedule assumptions across bids. Value analysis examines an alternative’s function, quality, maintenance and design consequences with the owner and responsible professionals. Document decisions and required revisions before pricing is relied upon; a lower number is not equivalent scope, guaranteed savings or authorization to substitute materials.

Before you begin

Common questions

Will True North perform all physical construction directly?

Construction services are available through our construction partners. Your written agreement identifies the contracting parties, work packages and responsibilities.

Does a drawing package establish a fixed construction price?

No. Pricing depends on the defined work, conditions, selections and contractor agreement. Document exclusions, allowances and the effect of later changes.

Your next step

A project in mind?
Let’s give it direction.

Start with what you know. We’ll help define the path ahead.

Request a project review