Design & documentation · Nationwide
Accessibility Planning and Review Coordination
Accessible use starts at the site arrival point and continues through the building. True North coordinates accessibility review and drawing interfaces for new work, alterations and existing-property improvements.
For owners, project teams and delivery partners nationwide. The written scope identifies True North’s work, the responsible professionals and any separately contracted construction.
Request a project reviewWhat the scope can include
Select the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.
Arrival and circulation
Coordinate parking, passenger loading, routes, curb transitions, slopes and entrances using appropriate survey and field information. Connect civil grades and building thresholds before details are finalized.
Interior spaces and features
Address doors, corridors, level changes, restrooms, counters, fixtures and operating clearances. Compare equipment and furniture layouts with the intended circulation and use.
Special uses and review
Coordinate dwelling, lodging, assembly, recreation and other use-specific features with the responsible reviewer. Organize assessment findings, improvement scope and required review or inspection records without promising a blanket certification.
Prepare for the assignment
You can start with incomplete records. Tell us what is available and what still needs to be established.
Information to bring
Plans and survey, proposed use, existing assessments, alteration limits, equipment and furniture layouts, photographs and access for field verification.
The agreed handoff
A scoped accessibility issue register, coordinated plan/details and documented review or inspection dependencies.
Decisions, fees and timing
Scope and dependencies determine the proposal. No universal price or approval date is assumed.
Confirm the basis and responsibility
Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.
Coordinate and review the work
Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.
Account for project-specific dependencies
Existing grades and construction, missing measurements, specialized uses, alteration scope and decisions about phased improvements.
Deliver the defined milestone
Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.
Before you begin
Common questions
Can compliance be confirmed from photographs alone?
Photographs can help scope the work, but dimensions, slopes, operating conditions and applicable requirements may need field verification and qualified review.
Does a small alteration settle accessibility for the whole property?
The scope of review and applicable obligations need to be established for the actual project. The deliverable identifies its limits and unresolved areas.
Your next step
A project in mind?
Let’s give it direction.
Start with what you know. We’ll help define the path ahead.
