Inspection, Commissioning and Closeout Coordination
Certificate of occupancy and closeout
A completed installation still needs the agreed inspection, test and acceptance records. True North coordinates outstanding requirements and the final handoff so owners can see what is accepted and what remains open.
For owners, project teams and delivery partners nationwide. The written scope identifies True North’s work, the responsible professionals and any separately contracted construction.
Request a project reviewOn this page
What the scope can include
Select the work and handoff your project needs. The agreement identifies the included deliverables and responsibilities.
Inspection coordination
Organize inspection requests, approved documents, access and correction lists. Track results against the correct permit and work area; the authorized inspector or authority makes the acceptance decision.
Testing and commissioning
Coordinate materials tests, system testing, balancing, commissioning and specialist verification where included. Match reports to locations and equipment, and route failures to the responsible party for resolution.
Approvals and owner handover
Collect final approvals, occupancy-related records, as-builts, manuals, warranties and outstanding actions. Separate operational readiness, permit closure and contractual completion instead of assuming one proves all three.
Prepare for the assignment
You can start with incomplete records. Tell us what is available and what still needs to be established.
Information to bring
Permit and inspection records, issued drawings and changes, test reports, contractor completion information, operating manuals and the owner’s handoff requirements.
The agreed handoff
A closeout register and indexed handoff package identifying accepted items, unresolved corrections, remaining permits and warranty responsibilities.
Decisions, fees and timing
Scope and dependencies determine the proposal. No universal price or approval date is assumed.
Confirm the basis and responsibility
Review the available records, intended endpoint and authority to use the information. Assign missing inputs, technical decisions and the parties who can authorize changes.
Coordinate and review the work
Prepare the included documents from agreed inputs, resolve interfaces with responsible specialists and track revisions. Record external decisions and conditions separately from work prepared for review.
Account for project-specific dependencies
Missing records, reinspection, correction work, testing access and the availability of agency, owner and specialist acceptance.
Deliver the defined milestone
Provide the controlling documents and remaining-action record. Identify what is accepted, what still requires a decision and what belongs to a separately contracted next stage.
Temporary, partial and phased occupancy
A temporary certificate of occupancy (TCO) is an authority-issued occupancy record with defined conditions. Partial or phased occupancy describes which areas or stages are proposed for use; the authority determines the available process and terminology.
Define the area and outstanding work
Provide the requested occupancy area, operating use, proposed dates, approved drawings, inspection results and unresolved corrections. Identify separation from construction, exits, accessible routes, fire-system operation, utilities and emergency access for professional and authority review. Coordinate an area/phase exhibit and a responsibility list for prerequisites; a contractor’s completion statement is not occupancy authorization.
Track temporary conditions through final closeout
If the authority permits temporary or phased use, record the authorized area, conditions, duration and remaining inspections exactly as issued. Track corrections and any subsequent request separately from final occupancy and permit closeout. Houston’s occupancy program provides a local TCO path; confirm the current project-specific instructions with Occupancy Inspections rather than assuming a nationwide process or guaranteed extension.
Special inspection and testing records
Build the closeout list from the approved documents, authority requirements and agreed owner criteria. Each report needs a responsible provider, identified work or equipment, results and a clear path for unresolved findings.
Statement of special inspections and testing package
Where required for the actual project, the responsible design professional establishes the statement of special inspections and its covered work. Coordinate approved-agency or inspector assignments, access, reports and discrepancy resolution with that scope. A testing package assembles specified materials or system reports and required acceptance records; simply collecting them does not mean True North performed or certified each inspection or test.
TAB reports and firestop inspection coordination
Testing, adjusting and balancing (TAB) reports document measured air or water performance for the specified system. The responsible mechanical team reviews these reports. Firestop inspection coordination concerns installed penetration or joint protection, approved systems, locations and qualified inspection records. Track deficiencies and corrective work separately from retests or reinspections. Link each record to the actual equipment or assembly before presenting closeout for acceptance.
Illustrative closeout index: received is not accepted
Fictional example of an indexed handoff. Each entry connects a document to the item it supports, its actual status, the accepting party and the next action. It does not certify a real project as complete.
Drawing record: installation information still missing
Entry 01 identifies the current issued drawing and a contractor-reported field change. Status: installation information awaiting verification. Next action: obtain the supported field record and the responsible team’s required revision. Do not label the original design as an as-built solely because construction has ended.
Test record: report received, disposition pending
Entry 02 identifies the equipment, test report and unresolved result. Status: report received, acceptance pending with the designated reviewer. Next action: route the result to the responsible specialist and document any correction or repeat test. Receipt of a PDF does not prove system performance or authority acceptance.
Approval and owner records: track separate endpoints
Entry 03 identifies an inspection result for its exact permit and work area. Entry 04 identifies manuals, warranty information and the owner’s outstanding handoff items. Track agency closure, operational readiness and contractual completion separately. The remaining-action record names the responsible party and next check instead of hiding unfinished items behind a general complete label.
Before you begin
Common questions
Does passing one inspection close the project?
No. Verify every applicable permit, discipline and contractual handoff requirement. The closeout register distinguishes each accepting party and remaining action.
Can missing as-builts be created from the original design?
Design drawings are background. Record drawings need supported installation information and must identify what remains unverified.
Can I occupy only part of a building while work continues?
Ask the applicable authority whether a partial, phased or temporary occupancy path is available for the actual conditions. Provide the area, exits, separation from work, operational systems and inspection record. Any authorization must be read for its area, duration, conditions and remaining steps.